Draft Terminal Concept 2

CLOSED: This discussion has concluded. Thank you for your feedback!

What opportunities and challenges do you see with this draft terminal concept?

Leave your comments in the forum below. 

For a better view of the concept, view the terminal design concept board here.

Earls Cove Draft Terminal Concept 2

The second of two potential concepts to guide the 25-year vision for the Earls Cove terminal. This concept has the following key features:

  • New waiting room & washroom on greenspace & close to the berth to replace end-of-life building
  • New through lane for traffic to drop-off / pick-up / parking to improve traffic flow and safety
  • New bus bay (suitable for one large bus or two small community buses) to facilitate future transit connections to the terminal
  • Landscaped area between the washroom building and holding lanes to improve customer experience
  • Removal of truck holding from the outside lane to make access to the industrial lot safer
  • In longer term, a new berth with two lane ramp, and merge lane to improve operational efficiency
Share on Facebook Share on Twitter Share on Linkedin Email this link
    <span class="translation_missing" title="translation missing: en-US.projects.forum_topics.show.load_comment_text">Load Comment Text</span>