Draft Terminal Concept 2
What opportunities and challenges do you see with this draft terminal concept?
Leave your comments in the forum below.
For a better view of the concept, view the terminal design concept board here.
Earls Cove Draft Terminal Concept 2
The second of two potential concepts to guide the 25-year vision for the Earls Cove terminal. This concept has the following key features:
- New waiting room & washroom on greenspace & close to the berth to replace end-of-life building
- New through lane for traffic to drop-off / pick-up / parking to improve traffic flow and safety
- New bus bay (suitable for one large bus or two small community buses) to facilitate future transit connections to the terminal
- Landscaped area between the washroom building and holding lanes to improve customer experience
- Removal of truck holding from the outside lane to make access to the industrial lot safer
- In longer term, a new berth with two lane ramp, and merge lane to improve operational efficiency