Draft Terminal Concept 1
What opportunities and challenges do you see with this draft terminal concept?
Leave your comments in the forum below.
For a better view of the concept, view the terminal design concept board here.
Earls Cove Draft Terminal Concept 1
One of two potential terminal concepts to guide the 25-year vision for the Earls Cove terminal. This concept offers the following key features:
- New waiting room & washroom building to replace buildings at end of life
- New through lane for traffic to drop-off / pick-up / parking to improve traffic flow and safety
- New bus bay (suitable for one large bus or two small community buses) to facilitate future transit connections to the terminal
- In longer term a new berth with two lane ramp and merge lane to accommodate double lane offloading and improve efficiency